Date: Fri, 29 Mar 2024 18:01:19 +0500 (YEKT) Message-ID: <1753827274.31856.1711717279623@jira> Subject: Exported From Confluence MIME-Version: 1.0 Content-Type: multipart/related; boundary="----=_Part_31855_1494951081.1711717279623" ------=_Part_31855_1494951081.1711717279623 Content-Type: text/html; charset=UTF-8 Content-Transfer-Encoding: quoted-printable Content-Location: file:///C:/exported.html
Successfully pass the free certification exam at IW Academy and become a= n Infinet Certified Engineer.
Determine the FTP cable length that is used to connect IDU and = ODU. The total cable length between LAN (behind IDU) and ODU should not be = longer than 100 meters.
=20
Once the ODU and antenna pole are installed they must be ground= ed via lightning protection grounding contour. ODU position must be lower t= han the highest antenna pole point at least by 2 ODU heights.
=20
Connect the FTP cable to IDU.
CAUTION
The power supply must not operate near a direct heat source, near w= ater or in an environment with high humidity. The cables must be conne= cted in such a way to prevent water flow to the power supply connectors.
NOTE
It is extremely important to install ODU connectors down!
CAUTION
In order to prevent device damage during testing or preliminary configur= ation in laboratory make sure that devices are configured with the lowest t= ransmitted power (fixed, not auto) and positioned them so that they are not= directed directly at each other.
PLEASE NOTE THAT VIOLATION OF THE ABOVE REQUIREMENTS VOIDS THE WARRANTY.=
CAUTION
Please note that the pressure equalization system in R5000-Smn/Smnb/Smnc= models is performed via gas exchange through a cable gland and Ethernet ca= ble jacket with a dry room where the power supply is installed. In order to= avoid ODU failure due to moisture entering the device, for example, during= the pressure drop during the rain, the cable gland assembly requirements s= hould be met and there are should be no cracks in the Ethernet cable jacket= .
In addition, you should avoid the Ethernet cable bending near the ODU an= d pinching with clamps, that can bring to the pressure equalization system = fault between the internal volume of the sealed ODU and the external enviro= nment during a sudden air temperature change. This may lead to the leakage = and device failures.