  1. Unpack the equipment
  2. Check items integrity
  3. Initial configuration is required for link establishment
  4. Prepare RF cables of the required length. For 5GHz devices, the recommended maximum RF cable length is 1meter
  5. Install and seal the connectors on the RF cables
  6. Important: Horizontal and Vertical polarization should match each other on both sides!

    Center
    Scroll Title
    title1 - Antenna ports. Figure - InfiLINK XG UM ODU Front Panel

  7. Determine the FTP cable length that is used to connect IDU and ODU. The total cable length between LAN (behind IDU) and ODU should not be longer than 100 meters. Service cable connecting IDU and ODU should be FTP Cat 5E cableFTP Cat5e cable with the outside diameter value not more than 7mm.
  8. If using SFP module, connect it to ODU, plug in the optical cable (the maximum length and type depend on the SFP module type) and seal the connector

    Center
    Scroll Title
    title1 - Cable gland nut, 2 - Split sealing grommet, 3 - Cable gland threaded coupling, 4 - Optical cable (from 2mm to 3mm), 5 - SFP-module (not included in the delivery package), 6 - Standard RJ-45 connector, 7 - GPS antenna port (antenna and cable are not included in the delivery package), 8 - Grounding bolt. Figure - InfiLINK XG Um ODU Installation Scheme

  9. Install (crimp) regular RJ-45 connector for ODU for ODU on the FTP cable and cable and seal it. Do not use the shielded RJ-45 connector on this end of the cable, as it should be attached only on the IDU the IDU end
  10. Lay the FTP cable cable (and the optical cable, if used) “from top to bottom” – from ODU to IDUfrom ODU to IDU
  11. Install (crimp and solder) shielded RJ-45 connector for IDU for IDU on the FTP the FTP cable
  12. Install ODU Install ODU on the mounting bracket, connectors facing down, and tighten it

    Note
    titleNOTE

     It is very important to mount the ODU connectors facing down.

  13. Connect the ODUthe ODU-IDU cable to the ODUthe ODU
  14. Seal the ODU the ODU Ethernet connectors
  15. Once the antenna and antenna pole are installed they must be properly grounded: connected to the building lightning protection circuit. Antenna’s position must be lower than the highest antenna pole point at least by 1 meter. If antenna is NOT DC-shorted (see antenna technical documentation), additional lightning arrestors protection unit must be used which are placed between ODU between ODU and antenna and are grounded to the antenna pole grounding circuit
  16. Connect the RF the RF cables to the antenna ports, minding the polarization marks. Twist the connectors tightly
  17. Connect the RF the RF cables to the ODU the ODU ports, after previously having touched the RF the RF cables’ connector case with ODU with ODU connector case
  18. Seal RF Seal RF connectors from both sides (ODU and antenna)
  19. Connect the FTP cable to cable to IDU, after previously having touched IDU touched IDU connector case with FTP cable connector cable connector case
  20. Provide grounding for IDUfor IDU
  21. Connect Ethernet cable to IDUto IDU
  22. Connect the IDU the IDU to power
  23. Connect to the Device using Telnet protocol.
Center
Scroll Title
titleFigure - IDU-BS-G and InfiLINK XG scheme connection