Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Assemble procedure

  • Step 1:  Put Put the cable gland nut, the split sealing grommet and cable gland threaded coupling onto the pre-terminated optical cable as shown on the figure belowgland threaded coupling onto the optical cable.
  • Step 2: Insert the split sealing grommet into the cable gland threaded coupling.
  • Step 3: Set the SFP module into the socket until you hear a click.
  • Step 4: Insert the optical connector into the SFP module.
  • Step 5: Screw the cable gland threaded coupling into the port and tighten it.
  • Step 6: Tighten the cable gland nut. Do not apply excessive force.

...