“Hardware Description” - This chapter describes the hardware, accessories and technical specifications of the unit.
“Installation Procedure” - This chapter describes the steps to be taken when installing the equipment at the installation sites and installation site requirements.
“Commissioning” - This chapter presents the actions and operations required for the initial setup of an operational point-to-point link using these units.
“Operation & Administration” - This chapter presents the functionalities of the web interface, a simple and efficient way to monitor the device status, configure and maintain the equipment.
“Troubleshooting” - This chapter presents the actions to be followed when investigating an occured problem.
Abbreviations
The following abbreviations are used in this document: