R5000-Smn(c) 5-6 GHz, 19 dBi supports several installation options such as pole mounting using the supplied clamps and pipe/wall/pole mounting using the optional mount kit MONT-KIT-85c.

Installation with clamps

The clamps supplied with each device allow it to be mounted on a 32-60 mm pole.

In order to mount the device on a pole follow the procedure below:

If there is a need for further alignment loosen the clamps, adjust the azimuth and tighten them again.

Installation with MONT-KIT-85c

Use the MONT-KIT-85c kit for a secure and reliable installation to a pipe/wall/pole. This kit allows 2-axis precise alignment under any mounting conditions.

In order to mount using MONT-KIT-85c follow the procedure below:

In order to prevent device damage during testing or preliminary configuration in laboratory make sure that devices are configured with the lowest transmitted power (fixed, not auto) and positioned them so that they are not directed directly at each other.

PLEASE NOTE THAT VIOLATION OF THE ABOVE REQUIREMENTS VOIDS THE WARRANTY.

Please note that the pressure equalization system in Infinet devices is performed via gas exchange through a cable gland and Ethernet cable jacket with a dry room where the power supply is installed. In order to avoid ODU failure due to moisture entering the device, for example, during the pressure drop during the rain, the cable gland assembly requirements should be met and there are should be no cracks in the Ethernet cable jacket.

In addition, you should avoid the Ethernet cable bending near the ODU and pinching with clamps, that can bring to the pressure equalization system fault between the internal volume of the sealed ODU and the external environment during a sudden air temperature change. This may lead to the leakage and device failures.