...
Power, wired and wirelesses statuses indication is performed via glassy plug of the cable gland.
Initialization stage
Center |
---|
gliffynamePort | Indicator |
---|
GE0 | - Blue - power supply connection.
- Red - 10Base-T Ethernet connection
- Yellow - 100Base-T Fast Ethernet connection.
- Green - 1000Base-T Gigabit Ethernet connection.
|
---|
SFP | Green - 1000Base-T Gigabit Ethernet connection. | Ethernet Indication | Gliffy Diagram |
---|
name | SFP Indication |
---|
Center |
---|
Indication |
---|
GE0 SFP | Power On (initialization) | The LEDs on both ports light up with white on second. Then LEDs check is performed: red, blue, green are lightened up sequentially. |
---|
Power On (loading) | At the beginning green is lightened a few seconds, on the second loading stage switches to blue. | ERP stage | Port (GE0 or SFP) with established link lights up with green, the second port remains blue. |
|
Working stage
Power Supply
Include Page |
---|
| _Indoor AC/DC injector IDU-CPE-G |
---|
| _Indoor AC/DC injector IDU-CPE-G |
---|
|
...