Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Power, wired and wirelesses statuses indication is performed via glassy plug of the cable gland.

Initialization stage

Green - 1000Base-T Gigabit Ethernet connection.
Center
gliffy
Ports
name
PortIndicator
GE0
  • Blue - power supply connection.
  • Red - 10Base-T Ethernet connection
  • Yellow - 100Base-T Fast Ethernet connection.
  • Green - 1000Base-T Gigabit Ethernet connection.
SFP
Condition
Ethernet Indication Gliffy DiagramnameSFP Indication Center
Indication

GE0

SFP

Power On (initialization)The LEDs on both ports light up with white on second. Then LEDs check is performed: red, blue, green are lightened up sequentially.
Power On (loading)At the beginning green is lightened a few seconds, on the second loading stage switches to blue.
ERP stagePort (GE0 or SFP) with established link lights up with green, the second port remains blue.

Working stage

Center

Gliffy Diagram
nameEthernet Indication
Gliffy Diagram
nameSFP Indication

Power Supply

Include Page
_Indoor AC/DC injector IDU-CPE-G
_Indoor AC/DC injector IDU-CPE-G

...