  1. Unpack the equipment
  2. Check items integrity
  3. Determine the STP cable length that is used to connect IDU and ODU. The total cable length between LAN (behind IDU) and ODU should not be longer than 100 meters

    Figure - Connection scheme
  4. Install (solder) connector for ODU on the STP cable and isolate it
  5. Lay the STP cable “from top to bottom” – from ODU to IDU
  6. After the STP cable has been laid, use distribution box to switch from STP cable to UTP cable with RJ-45 connectors. Service cable connecting IDU and ODU should be  STP Cat 5E cable.
  7. Install ODU on the mounting bracket according to the direction required for the link. Do not tight it too hard unless the antenna alignment is not complete. Install ODU connectors down.
  8. Connect the ODU-IDU cable to the ODU
  9. Isolate the ODU connector joint place
  10. Once the ODU and antenna pole are installed they must be grounded via lightning protection grounding contour. ODU position must be lower than the highest antenna pole point at least by 2 ODU heights

    Figure - Installation scheme
  11. Connect the UTP cable to IDU
  12. Provide grounding for IDU
  13. Connect Ethernet cable to IDU
  14. Provide power supply for IDU
  15. Connect to the Device using Telnet protocol

CAUTION

 It is extremely important to install ODU connectors down!